Product Details:
Payment & Shipping Terms:
|
Interior Material: | Stainless Steel Plate(SUS304) | Exterior Material: | Baked Painting Steel Plate Or SUS304 |
---|---|---|---|
Controller: | LCD Touch Panel | Cooling Mode: | Single Stage Refrigeration System |
Humidity Constancy: | ±2.0%RH | Temp Fluctuation: | ±0.5℃ |
High Light: | humidity and temperature controlled chamber,temperature test chamber |
1000L Temperature humidity chamber and environmental test chamber with LCD toch panel
Description
Able to accurately simulate a wide range of complicated natural environments, and is suitable for
reliability test in industrial products. Meet GB5170.2.3.5.6-95 standard requirements of environmental
testing equipment and test methods for the basic parameters of electric and electronic products under
the condition of humidity, low temperature, high temperature, and constant heat.
Application
Temperature and humidity test chamber is also called temperature and humidity
testing machine, constant temperature and humidity experimental chamber, programmable wet heat
alternating test chamber, or constant temperature machine. The Temperature and humidity test chamber
is used to inspect equipments quality and test performance of materials in various environments,
and all kinds of materials properties of heat resistance, cold resistance, dry resistance and
moisture resistance, which is fit for Electronics, electrical appliances, mobile phones, communications,
meters, vehicles, plastic products, metals, food, chemicals, building materials, medical, aerospace and
other products quality inspection.
Specifications
Model | KMH-1000S | |||||
Inside Dimension(cm) | 100*100*100 | |||||
Outer Dimension(cm) | 120*203.5*201.5 | |||||
Temp range | S-70 ℃~150 ℃ | |||||
Temp deviation | ±20 ℃ | |||||
Temp fluctuation | ±0.5 ℃ | |||||
Temp uniformity | ±2 ℃ | |||||
Humidity range | 20-98%R.H | |||||
Humidity deviation | ±3.0%RH(>75%RH)±5.0%RH(≤75%RH) | |||||
Humidity uniformity | ±3.0%RH | |||||
Humidity constancy | ±2.0%RH | |||||
Heating and cooling rate | R+20 ℃↓-20 ℃Within45min L+20℃↓-40℃Within60min S+2020℃↓-70℃WITHIN80min | |||||
-20 ℃↑+100℃D19Within35min -40 ℃↑+100℃D19Within45min -70 ℃↑+100℃D19Within60min | ||||||
System | Balanced&Humidity Control System | |||||
Interior material | Stainless Steel Plate(SUS304) | |||||
Exterior material | Baked Painting Steel Or Stainless steel(SUS304) | |||||
Insulation material | Rigid polyurethane Foam and Glass Fiber Wool | |||||
Refrigeration system | Hermetic compressor,Single stage refrigeration CFC free refrigerant system | |||||
(HFC-507/HFC-23)Hermetic Compressor,Cascsde Refrigeration CFC free refrigerant | ||||||
Controllor | LCD Toch panel,Chinese or English display selectabile | |||||
Safety Devices | No fuse breaker,over pressure,over heat and over current protectors | |||||
for compressor,over temp.protector,over load protectoroffan,dry heat prtechto | ||||||
Standard Accessories | Sightwindow*1,cable port(portØ50mm)*1,shelves*2,chamberlamp*1,power cable2m | |||||
Weight(Kg) | 520 | |||||
Ambient Temp | +5℃~+35℃ | |||||
Power | AC380±10%50Hz 3phase 4 wires+Groud Wires |
Environmental test chamber Standard
GJB150.3 high-temperature testing
GJB150.4 low-temperature testing
GJB150.9 humid testing
GB11158 Technical conditions for high-temperature testing box
GB10589-89 Technical conditions for low-temperature testing box
GB10592-89 Technical conditions for high and low temperature testing box
B/T10586-89 technical conditions for humidity testing chamber
GB/T2423.1-2001 Low-temperature testing methods
GB/T2423.2-2001 High-temperature testing methods
B/T2423.3-93 Testing Method for humidity Test Chamber
GB/T2423.4-93 Alternating hot and humid testing method
GB/T2423.22-2001temperature testing method
IEC60068-2-1.1990 low-temperature testing method
IEC60068-2-2.1974 high-temperature testing method
FAQ:
Q1 : Can you customize the product?
A: Yes, we can customize any products according to requirements.
Q2 : How to choose the most suitable products?
A: Our professional team will give you the best suggestion,just be patiently to tell us the information about
the parameters your required.
Q3 : Can you arrange installations and commissioning in our lab?
A: Firstly, for standard chamber we had 3-5 days commissioning before shipping , you just need link
power in your lab, then can start to operate;
Secondly; we had detailed operation manual with chamber , any problems you can find and solve in it;
Thirdly, some of customized chambers we should to install and teach your team to operate.
Product details
Packing and Shipment:
Contact Person: Anna Hu
Tel: +8618098282716